Thermoelectric and hydroelectric power plants projects

Our team has participated in the following projects:

  • Strengthening of the northern dyke, backfilling, closing and reclamation of the eastern section – “TPS Sliven” – Slag depot
  • Anti-filtration measures. Epumping tests, design of a water lowering system. Creation of a stationary hydrogeological model simulating the natural regime in a filtration environment and a non-stationary model for calculating the estimated levels in the strata – “Maritsa Iztok 3 TPP” – slag dump Iskritsa – Reconstruction of Section 1a
  • Slope stability assessment and preparation of an upgrade project – stage 4. Engineering geological survey – “Solvey sodi” sludge dump “Padina”
  • Section 3B – section with manifested deformations along the fence dikes between profiles 19 and 21. Engineering geological studies – “Brickel” – slag dump
  • Control boreholes. Engineering geological survey. Physical-mechanical and chemical studies of slag samples – “Deven TPP” – new landfill for storage of production waste
  • Engineering geological and hydrogeological studies of ” Dolna Bešovitsa Mini Hydroelectric Plant “
  • Engineering geological and hydrogeological studies of ” Varvara Mini Hydroelectric Plant “
  • Reinforcement of the access road to pumping – storage hydropower plant “Belmeken” – apparatus camera for the areas affected by floods – National Electricity Company – Rila Hydroelectric Group
  • Expansion of the piezometer monitoring system. Report on the construction of 8 pcs. piezometers – “Solvey sodi” Sludge dump “Padina”